Minimum Documents for a Reliable Quotation
An unreserved quotation stems from a comprehensive information package. With these documents, we can respond within a few days with figures that hold true until delivery.
- Dimensioned plans of existing conditions and proposed design, in editable format.
- Sections and elevations showing clear heights and suspended ceilings.
- Finishes schedule with brands and codes, or at least the reference quality level.
- Proposed services schematics, or indication of main utility requirements.
- Furniture layout indicating items supplied by the client.
- Site access restrictions: hours, lifts, loading/unloading areas.
The Information Nobody Writes Down But Changes Everything
Desired opening date, indicative budget, presence of operational activities, manager or brand requirements: these elements influence the technical solution more than many graphic details. Sharing them in advance avoids designing solutions that are over budget or incompatible with timelines.
How We Work with Firms
We receive the architectural design and develop the detailed executive drawings, maintaining the firm's design language and taking responsibility for the on-site execution. The firm retains aesthetic control, while we guarantee timelines, compliance, and site management.
Upon request, we participate in client meetings to illustrate technical choices: in most cases, this accelerates approvals.
Frequently asked questions
- Do you sign the executive drawings?
- We develop and sign the executive drawings for which we are responsible — services, fit-out structures, and construction details — coordinating with the firm's project management.
- How long does it take for a quotation?
- With complete documentation, we respond within 48 working hours with a structured estimate and, where necessary, within one week with a detailed bill of quantities.
Translated from the Italian original. Contact us for the official version.
